Introductory write-up (not graded) of approved project:  9/14/2012

Draft of the Requirement Specification (SRS) document:  10/4

SRS document: 10/11

Draft of the Design Document: 10/30

The first rewrite of the SRS document: 11/6

Design Document: 11/8

Draft of the Test Plan Document: 11/13

The first rewrite of the Design Document: 11/20

Test Plan Document: 11/27

The second rewrite of the SRS document: 12/6

The second rewrite of the Design Document: 12/11

First version of the User Manual: 12/13

Class presentation: 12/13

Test Report: 12/20

 

Complete project, including the rewrites of test report, user manual, and the final project write-up is due Friday, 12/21/12, midnight.